I am a buyer of an import home retail enterprise in the Pearl River Delta. I need to import a batch of solid wood furniture from Southeast Asia to Humen Port this month. This is the first time my company has used the import customs clearance route at Humen Port.
Previously, when clearing customs at other ports, the process was delayed for 12 days due to process connection errors, resulting in more than 8,000 yuan of detention fees and storage fees, and a lot of extra losses. Now the domestic warehouse is waiting for this batch of goods to catch up with the autumn new product launch schedule, and the time is very tight.
I am afraid that the customs clearance will be overdue and miss the sales node. I want to know how long the agency import customs clearance at Humen Port generally takes, if there is a clear time range, what will extend the time, and what preparations can be made in advance to shorten the customs clearance time?
SophiaСтаж работы:7Оценка клиентов:5.0
Старший консультант по таможенному оформлениюНачать чат
The time for customs clearance at Humen Port needs to be broken down according to all - link nodes. For conventional general goods,the operation cycle starts from the document replacement after the ship arrives at the port. Normal compliant general goods only take 1 - 3 working days to complete customs clearance and goods pickup. If it is a special goods that requires commodity inspection and inspection,the overall cycle will be extended to 3 - 7 working days.
The pre - document review link can be completed 1 - 2 days before the goods arrive at the port. Hand over the packing list,invoice,contract,certificate of origin and relevant qualification documents of the goods to the agency in advance,confirm that the code classification is accurate,and the document information is consistent with the actual situation of the goods,so as not to occupy the operation time after the goods arrive at the port.
In the core node connection link,after arriving at the port,the three steps of document replacement,declaration and tax payment can be completed. The agency can coordinate the document replacement information with the shipping company in advance,and the tax can be pre - authorized for deduction. After arriving at the port,declare immediately. After normal tax payment and release,the container can be arranged for pickup. The entire connection process can be controlled within 1 working day.
If inspection is required,prepare the description documents of the goods' name,specifications and materials in advance to cooperate with the inspection. Conventional inspection can be completed within 2 working days. If a laboratory test is required,it will take an additional 3 - 5 working days. In terms of abnormal response,confirm in advance whether the goods require special import qualifications and whether there is a dispute over classification. Make a pre - classification application in advance to avoid the cycle being prolonged due to classification disputes and detention. To stably control the customs clearance time,the core is to confirm the compliance information before arranging the shipment,so that the overall time can be controlled within the estimated range and there will be no unexpected delays.
OliviaСтаж работы:5Оценка клиентов:5.0
Старший консультант по таможенному оформлениюНачать чат
Currently, Humen Port adopts the integrated customs declaration mode. If there is an error in code classification in the declaration data or there is a deviation between the declared price and the price predicted by the customs system, it will directly trigger manual price review, and the review process will generally extend the customs clearance time by 2 - 5 working days. If there is a situation of account hanging and document pushing, it will take about 3 working days to delete the declaration and resubmit it, which will directly lengthen the overall customs clearance cycle.
Provide the goods' purchase contract, payment certificate and original factory invoice in advance to speed up the price review process and avoid unnecessary time loss. For goods transferred across customs districts, complete the integrated customs declaration registration in advance to shorten the process time by 1 - 2 days and ensure customs clearance to proceed as planned.
JohnСтаж работы:6Оценка клиентов:5.0
Консультант по возврату экспортного НДСНачать чат
The free storage period at Humen Port is generally 3 working days after the goods arrive at the port. If the free storage period is exceeded, storage fees will be incurred. At the same time, if the customs clearance is overdue, detention fees will also be generated, and the cost will increase day by day.
To control the customs clearance time, confirm the expected arrival time with the shipping company in advance. The agency can coordinate the document replacement in advance and issue the document in advance to avoid 1 - 2 days of delay caused by the shipping company's delayed document release. For full - container goods, arrange the truck reservation in advance.
After customs clearance and release, the container can be picked up directly to shorten the container yard waiting time. For less - than - container goods, confirm the time of document splitting with the less - than - container agency in advance. Complete the document splitting immediately after arriving at the port to shorten the operation time by at least 1 day and make the overall timeliness more controllable.
EmilyСтаж работы:3Оценка клиентов:5.0
Консультант по работе с клиентамиНачать чат
The payment method of import VAT will affect the customs clearance time. If offline counter payment is adopted, it will take 1 - 2 working days to complete the tax bill verification. However, if electronic self - payment or pre - deduction and advance payment mode is adopted, the verification can be completed within half an hour after tax payment, which can directly shorten the time by 1 - 2 days.
If the conditions for VAT deferral are met, the VAT deferral mode can be adopted, and there is no need to pay VAT in advance. This can not only optimize capital occupation, but also save the tax bill verification link and directly shorten the customs clearance time.
The VAT deferral requires that the enterprise's tax payment credit rating is above level B and there are no major tax violation records. Enterprises that meet the conditions can complete the registration in advance to effectively compress the customs clearance time without additional delays.
SarahСтаж работы:3Оценка клиентов:5.0
Консультант по валютным расчетамНачать чат
If the cross - border payment information is inconsistent with the import declaration information, it will trigger customs compliance verification. The verification process generally takes 3 - 7 working days and will directly extend the customs clearance time. For goods paid by cross - border RMB, prepare screenshots of CIPS payment messages in advance to ensure that the payment information is consistent with the declaration information, so that it can pass the verification quickly without delaying the time.
If payment is made by letter of credit, confirm in advance that the payment subject is consistent with the import declaration subject to avoid triggering verification and prolonging the customs clearance cycle due to inconsistent subjects. Sort out all payment documents in advance and hand them to the agency for pre - verification to eliminate compliance risks before arriving at the port and avoid delaying the progress due to verification after arriving at the port.
AlexanderСтаж работы:10Оценка клиентов:5.0
Старший консультант по внешней торговлеНачать чат
If the imported goods involve intellectual property registration and the authorization documents are not prepared in advance, the goods will be detained and require re - authorization verification, which will take at least 5 working days and will greatly extend the customs clearance time. For brand goods, prepare the brand owner's import authorization in advance and complete the customs registration and comparison to quickly release the goods without delay.
If wooden packaging is involved and the fumigation treatment or fumigation certificate is not provided in advance, the entire container will be required to undergo pest control, which will take 3 - 5 days and extend the customs clearance cycle. Prepare the corresponding MSDS report in advance according to the goods' attributes, confirm that the packaging meets the import requirements, and hand it to the agency for pre - review to eliminate packaging problems before shipment and avoid delays in port - arrival rectification to ensure timely customs clearance.
CharlotteСтаж работы:4Оценка клиентов:5.0
Консультант по обмену валютНачать чат
The inspection at Humen Port is divided into machine inspection and manual container - unloading inspection. If there is no abnormality in machine inspection, it can generally be completed in half a working day without significantly extending the customs clearance time.
For manual container - unloading inspection, sort out the packing list of the goods in advance and correspond to the location of each pallet to speed up the inspection speed. The original 1 - day inspection can be shortened to about 4 hours.
If the seal is abnormal, prepare the seal information of the bill of lading in advance and explain the situation during transportation to speed up the inspection process and avoid extending the verification time due to seal problems. For the inspection and laboratory test process, coordinate and make an appointment with the testing agency in advance to shorten the report - issuing time by 1 - 2 days.
RobertСтаж работы:6Оценка клиентов:5.0
Консультант по складской логистикеНачать чат
For dangerous goods or goods requiring special supervision, if the packaging does not meet the UN standard or a qualified MSDS report is not provided, the goods will be detained and required to re - rectify the packaging, which will take at least 7 days and greatly extend the customs clearance time. For imported solid wood goods, if the packaging has not undergone fumigation treatment or the fumigation certificate is not provided, pest control will be required, which will take 3 - 5 days and extend the customs clearance cycle.
Prepare the corresponding MSDS report in advance according to the goods' attributes, confirm that the packaging meets the import requirements, and hand it to the agency for pre - review to eliminate packaging problems before shipment and avoid delays in port - arrival rectification to ensure timely customs clearance.
WilliamСтаж работы:10Оценка клиентов:5.0
Консультант по международной логистикеНачать чат
The customs clearance documents of imported materials will directly affect the follow - up export tax refund verification. If the document information in the customs clearance link is inaccurate, it will not only extend the customs clearance time, but also lead to the failure of the follow - up export tax refund verification and affect the tax refund progress.
Ensure in advance that the value, quantity, and name of the customs clearance documents are consistent with the purchase information and meet the requirements of four - flow consistency. This can not only speed up the customs clearance review speed, but also avoid problems in the follow - up tax refund link.
Complete document registration in advance, sort out all electronic and paper documents, hand them to the agency for review, and only declare after confirming that the information is accurate. This can shorten the customs clearance review time and avoid follow - up tax refund risks. For imported goods across sales periods, conduct pre - verification of declaration information in advance to avoid the time loss caused by deleting the declaration and re - declaring due to information errors.
EllaСтаж работы:10Оценка клиентов:5.0
Старший финансовый консультантНачать чат
The stability of customs clearance time directly affects the inventory planning of the entire import supply chain. Overdue customs clearance will lead to stockouts, and early customs clearance will increase storage costs. Therefore, it is necessary to adjust the entire supply chain schedule according to the conventional customs clearance cycle at Humen Port.
The customs clearance reserve time can be divided into conventional buffer and abnormal buffer. Conventional general goods reserve 3 days of buffer time, and special goods reserve 7 days of buffer time to ensure that the new product or production schedule is not affected. If importing from Humen Port for a long time, the customs clearance link can be linked with logistics and warehousing.
Arrange truck and warehouse space in advance to pick up the goods and enter the warehouse immediately after customs clearance to shorten the overall chain time. Adjust the choice of trade terms according to the customs clearance time to control the customs clearance rhythm and ensure stable time.