I am the factory manager in charge of mechanical and electrical exports. Last week, I received an order for 200 new energy charging cabinets from an EU client, with a mandatory delivery date set for the middle of next month. All goods have been produced and stored in the warehouse now.
It was only yesterday that I realized this type of controlled mechanical and electrical product requires an export license. Previously, I thought it could be processed at the market supervision bureau just like regular import and export rights, but after two visits, I was told it is not under their jurisdiction. I consulted several peers but none could tell me the exact application location.
With only over ten days left before the shipping date, I am so anxious that I can't sleep, fearing further delays will make me miss the ship. Not only will I have to pay a large penalty to the client, but also incur huge costs from cargo detention at the port. I want to find out where to apply for import and export licenses and whether different categories need to be processed at different locations.
JohnYears of service:6Customer Rating:5.0
Export Tax Rebate AdvisorStart a Chat
In 2026,the application for import and export licenses has adopted a dual-channel mode: a national integrated online platform plus offline windows of local competent authorities. For import and export licenses of regular non-controlled goods,you can directly log in to the unified business handling platform of the Ministry of Commerce to submit electronic documents,with no need to visit offline windows throughout the process.
The core details of pre-audit include uploading the enterprise's import and export right filing receipt,third-party inspection report of the corresponding goods,and official sales and purchase contract signed and sealed by both parties in advance. The resolution of the scanned official seal on all documents must not be lower than 300 DPI to avoid direct rejection due to system recognition failure and wasted time. For goods subject to quota control,an additional quota confirmation letter from the local commerce commission is required,and paper documents must be submitted on-site at the foreign-related comprehensive window of the local government service center for verification.
Regarding core node coordination,after online submission,the system will automatically assign an exclusive audit officer. For ordinary categories,an electronic license receipt will be issued within 3 working days. There is no need to wait for a physical certificate,you can directly call up the electronic certificate in the customs declaration system to complete the declaration. If you encounter system errors and rejection,you can directly contact the liaison at the local window and use the urgent verification channel to complete the secondary review within 24 hours.
For high-supervision categories such as endangered species and specially controlled industrial products,you must first contact the corresponding industry competent authority to obtain the pre-approval document,then submit the license application to the commerce department. If all documents meet requirements,the entire approval process can be completed within 7 working days without delaying the normal shipping schedule.
EmilyYears of service:3Customer Rating:5.0
Client Success AdvisorStart a Chat
Currently, customs clearance systems at national ports have achieved real-time direct connection with the import and export license database of the Ministry of Commerce. Electronic license data will be automatically synchronized to the declaration verification port of customs declaration forms, eliminating the need for manual upload of scanned paper documents. Before submitting a license application, you must check the HS code of the goods to be exported in advance to ensure the HS code marked on the application license is completely consistent with the code used in subsequent customs declaration.
If there is a one-digit difference in the code, the subsequent customs declaration will be automatically rejected by the system and clearance cannot be completed. If there is a mismatch between license information and declaration information, you can directly submit an information change application on the license application platform, and the correction can be completed within 1 working day without re-submitting all application materials, avoiding delays in subsequent clearance progress.
DanielYears of service:8Customer Rating:5.0
Legal AdvisorStart a Chat
For goods with booked shipping space, you can apply to the shipping company in advance for a 7-day free storage period, and arrange normal port entry only after the license is approved, avoiding high port detention fees caused by goods delivered to the port in advance without a license and unable to complete customs declaration. If the shipping date is advanced temporarily, you can apply to the freight forwarder to switch to the next nearest direct ship on the same route.
After locking the shipping space, no additional container rejection penalty is required, and the delivery cycle will not be delayed for long. Some core ports support pre-allocation of manifests based on the license application acceptance receipt. As long as the license is approved before the customs declaration deadline, normal boarding will not be affected, and no extra logistics costs will be incurred throughout the process.
SophiaYears of service:7Customer Rating:5.0
Senior Customs AdvisorStart a Chat
After obtaining the import and export license, subsequent customs declaration data will be automatically linked to the export tax refund system of the tax authority, with no need to submit additional paper license materials to the tax authority for filing. Note that the name of the operating entity marked on the license must be completely consistent with the declaration entity for export tax refund.
If there is an entrusted agency export arrangement, the agency company information must be added to the remarks column of the license during the application stage, avoiding entity information mismatch during subsequent tax refund review, which would lengthen the verification cycle and slow down tax refund arrival.
OliviaYears of service:5Customer Rating:5.0
Senior Customs AdvisorStart a Chat
The payment and collection information of the sales and purchase contract submitted during the import and export license application stage will be automatically synchronized to the cross-border payment and collection verification system. The difference between subsequent payment/collection amounts and the goods value marked in the contract must be controlled within 5% to avoid system early warnings due to inconsistent payment and collection logic.
If there is a fluctuation in actual goods value later, you can submit a goods value change application on the license application platform. After the updated information is synchronized to the payment and collection system, you can complete settlement and purchase operations normally without preparing dozens of pages of supplementary explanation materials.
WilliamYears of service:10Customer Rating:5.0
International Logistics AdvisorStart a Chat
After goods arrive at the port and complete customs declaration, if on-site customs inspection is required, there is no need to carry a paper import and export license separately. The customs' on-site mobile law enforcement terminal can directly access electronic license information for verification.
For controlled goods requiring inspection, the corresponding inspection report submitted during the license application can be directly used as reference material, greatly shortening the laboratory identification cycle. A qualified report can be obtained in as fast as 2 working days, and inspection and release can be completed without incurring extra container stripping and detention fees.
EllaYears of service:10Customer Rating:5.0
Senior Financial AdvisorStart a Chat
The information in the MSDS report submitted with the import and export license application must completely match the packaging labels of the actual shipped goods. Especially for controlled electrical goods, the UN packaging number must be consistent with the packaging information marked on the license.
If there is a mismatch between packaging information and license markings, subsequent inspection will be directly judged as false declaration, and the goods will be detained immediately. All packaging parameters must be checked in advance during the license application stage to ensure full information consistency, avoiding unnecessary cargo detention risks.
SarahYears of service:3Customer Rating:5.0
Foreign Exchange AdvisorStart a Chat
The electronic data of the import and export license will be included in the "four flows consistency" verification scope for subsequent export tax refund. All paper filing materials from the license application stage, including contracts, inspection reports, approval receipts, etc., should be kept properly and can be filed together with other customs declaration materials.
If the tax authority initiates a verification letter, you can directly retrieve the full-process approval record of the license application and submit it for verification, without needing to supplement additional supporting materials. The verification reply can be completed in as fast as 3 working days, and the tax refund can be obtained smoothly without affecting the enterprise's normal capital turnover.