Comprehensive Analysis of Jinan Import Procedures: Practical Operations Guide from Customs Declaration to Clearance
Jinan enterprises often face issues such as complex customs declaration processes and rapid policy updates when handling import businesses.As a foreign trade agent that has operated at the Shanghai port for 20 years,Zhongshitong has witnessed many cases where goods were stranded at the port due to incomplete procedures.Below,based on the latest regulatory rules of 2026,we break down the core steps and pitfall-avoidance points for Jinan import procedures.

1.Customs Valuation: The Breakthrough Point for Price Disputes
Customs valuation is a key link in import customs clearance.In 2026,the "substantive transaction review" clause was newly added.For example,a Jinan machinery company imported German machine tools; its declared price was questioned by the customs for a 15% deviation from the average international market price.Finally,it successfully passed the valuation by supplementing: ① Certificate of Origin (proving that the product is not on the EU anti-dumping list),② Bank-issued payment voucher (proving no hidden commissions),③ Third-party valuation report (issued by a German industry association).
- Common Risk Points: Incomplete declaration elements (e.g.failure to indicate "whether installation tools are included") → Trigger inspection,resulting in demurrage fees.
- Practical Suggestions: Communicate with the classification department of Jinan Customs in advance about the HS code to avoid tariff differences caused by incorrect codes (e.g."Optical instruments under HS code 9021" with a 5% tariff vs "Medical devices under HS code 9031" with a 10% tariff).
2.Pre-Inspection of Commodities: Avoiding the "Detention Upon Arrival" Trap
The new 2026 regulations on commodity inspection require that imported goods must complete the pre-inspection of "three documents matching" before customs declaration.Last year,a Jinan chemical enterprise imported 100 tons of coatings; because it failed to upload the "transportation mode" field in the MSDS (Material Safety Data Sheet) in advance,the goods were detained for 3 days upon arrival at the port,resulting in a total of 42,000 yuan in demurrage fees and fines.
| Product Type | Required Pre-Inspection Materials | New Requirements in 2026 |
|---|---|---|
| General Cargo | Packing List,Contract,Invoice | Data Verification Between Electronic Customs Declaration Form and Bill of Lading |
| Hazardous Chemicals | MSDS,Hazard Label (UN No.) | Self-assessment Form for Transportation Risk Level |
| Food | Health Certificate,Import Inspection and Quarantine Certificate | Record Number of Chinese Labels |
Key Operation: Submit the electronic pre-inspection application to Jinan Commodity Inspection Bureau 72 hours in advance,and focus on verifying the consistency between the "declared brand" and the "actual trademark" to avoid being deemed as products without clear brand,production date and manufacturer due to OEM products.

3.Animal and Plant Quarantine: Special Rules for Cold Chain and Endangered Species
A Jinan foreign trade company imported Australian beef; because it failed to submit: ① Official quarantine certificate from the exporting country,② Temperature control records during transportation (new requirement in 2026),the goods were inspected at Jinan Airport.Zhongshitong assisted the company in supplementing the cold chain temperature tracking report (showing a temperature of 0-4°C throughout the process),and finally only a fine of 5,000 yuan was imposed without affecting the subsequent customs clearance.
- Notes on Sensitive Categories
- Animal-derived products: Need to apply for the entry animal and plant quarantine permit 15 working days in advance
- Endangered species (e.g.ivory products): Need to provide the "Certificate for Import Permission of Endangered Species"
4.Import License: Time Difference Management for Qualification Application
The new 2026 regulation from the Ministry of Commerce: The processing of automatic import license will be reviewed and feedback will be given within 5 working days after submission through the single window.A Jinan auto parts company failed to reserve 10 working days for handling 3C certification,resulting in contract breach.
Practical Steps
- Confirm whether the product is included in the license management catalogue (e.g."lithium batteries",newly added in 2026,requires separate application)
- Submit materials: Business license (business scope must include import and export of goods),import contract
- Zhongshitong realizes off-site declaration and local verification through the green channel of its Shanghai headquarters,which is 3-5 days faster than enterprises applying on their own on average
Risk Warning: The validity period of the import license is 12 months; if not used before expiration,a re-application is required.Enterprises must not hoard licenses due to temporary shortages,which will lead to handling fees for subsequent license withdrawal.
Unique Advantages of Zhongshitong’s Jinan Import Agency Services
Relying on the global agency network of its Shanghai headquarters,Zhongshitong can realize:
- National port linkage: Off-site customs declaration at ports such as Qingdao Port,Tianjin Port,Lianyungang Port,etc.saving the cost of travel for Jinan enterprises
- Exchange rate locking service: Reduce exchange rate loss by 1-2 percentage points for Jinan enterprises through the foreign exchange settlement channel of Shanghai Free Trade Zone
- Policy prediction: Monitor new regulations such as the Announcement No.3 of 2026 of the General Administration of Customs in real time,and push risk tips 3 working days in advance
If you encounter any problems in Jinan import agency,you can contact Zhongshitong’s Jinan office (no need for phone call,just leave a direct message).We will ensure the smooth customs clearance of your goods through the dual-track model of "pre-inspection list + risk plan".