I am the procurement director of a precision parts manufacturing factory in Suzhou. Last month, I handled the import process of two German high-precision grinding machines on my own. Due to incorrect HS code classification, the goods were detained at Suzhou Port for 22 days, and I paid 87,000 yuan solely for port detention and container detention fees. Later, the customs valuation was nearly 400,000 yuan higher than our declared value, leading to an extra tax payment of more than 120,000 yuan.
The total loss from the whole project delay was nearly 300,000 yuan. Now we plan to export 5 domestic CNC lathes to foundries in Vietnam and Malaysia in the second half of the year. We really dare not handle the process by ourselves, and want to find a professional import and export agency to take charge of the whole operation. We would like to know what the whole agency process is, how to avoid the classification, valuation and port detention problems we encountered before, and whether there are ways to reduce tax and logistics costs.
DanielYears of service:8Customer Rating:5.0
Legal AdvisorStart a Chat
The full process of agency import and export of equipment should be involved from the preliminary preparation stage. The first step is document pre-review. For imported equipment,it is necessary to collect the original factory invoice,trade contract,technical parameter specification,and newness identification report (additionally required for second-hand equipment) in advance. Complete HS code pre-classification and pre-review 7 working days in advance to avoid customs detention caused by classification errors. For exported equipment,it is necessary to check the access requirements of the destination country in advance,such as whether ASEAN countries require a certificate of origin to enjoy tariff reduction,and complete inspection and quarantine filing in advance.
At the core node connection stage,for the import link,manifest pre-declaration will be arranged in advance,and advance declaration will be completed 3 days before arrival at the port. Eligible equipment can apply for the "two-step declaration" and "early release" modes,which shortens the customs clearance cycle to less than 24 hours and avoids additional costs caused by port detention. For the export link,shipping space locking will be arranged in advance,and transportation reinforcement plans will be made for precision equipment in advance to avoid cargo damage during transportation.
At the abnormal response plan level,specialists with more than 10 years of valuation experience will be arranged in advance to coordinate the customs valuation link,and prepare supporting materials for original factory prices and import and export records of the same model of equipment. In case of valuation objections,the appeal can be completed within 3 working days. Finally,at the compliance implementation stage,all documents are retained for at least 10 years,and the full process of foreign exchange settlement and tax refund declaration is completed simultaneously. Tax refund for exported equipment can be credited to the account in as fast as 3 working days,with no compliance loopholes throughout the process.
SarahYears of service:3Customer Rating:5.0
Foreign Exchange AdvisorStart a Chat
HS code classification of import and export equipment directly determines the tariff rate and supervision conditions. A 2-digit deviation in the code may trigger customs early warning, leading to order deletion and re-declaration in minor cases, or transfer to the anti-smuggling department for verification in serious cases.
For the valuation link of imported equipment, it is necessary to prepare complete price chain materials in advance, including the original factory procurement contract, foreign exchange payment voucher, international freight and insurance invoice, and reference of the national average import declaration price of the same brand and model of equipment in the past year. When the customs valuation is on the high side, you can submit a price consultation application, and valuation adjustment can be completed in as fast as 3 working days after submitting supporting materials.
In 2026, customs clearance integration and data interconnection have been realized in ports across the country. Enterprises can independently choose the declaration port. Goods that have completed pre-classification and pre-review in advance can enjoy the green channel of priority declaration and priority release, without repeated submission of audit materials.
AlexanderYears of service:10Customer Rating:5.0
Senior Trade AdvisorStart a Chat
The selection of logistics routes for import and export equipment should comprehensively consider three core indicators: time limit, cost, and cargo damage rate. For imported equipment from Europe, the route of China-Europe Railway Express directly to the inland port is preferred, which can shorten the transportation cycle by more than 20 days compared with sea freight, and the cost is only about 15% of that of air freight.
For equipment exported to Southeast Asia, you can choose the routes of China-Laos Railway and New Western Land-Sea Corridor, which arrive at the port directly without transshipment, and can avoid the problems of space shortage and container rolling. For high-value precision equipment, you can apply for an additional 7-14 days of free storage period and free container period.
Lock the shipping space in advance and purchase sufficient freight insurance at the same time. In case of container detention fee disputes, you can directly apply to the shipping company for reduction and exemption with the free period voucher applied in advance, with a maximum 100% reduction of container detention fees.
WilliamYears of service:10Customer Rating:5.0
International Logistics AdvisorStart a Chat
Imported equipment can apply for the VAT deferral policy. There is no need to directly pay import value-added tax when the goods are imported and cleared, which can be deferred to the subsequent VAT declaration period for payment, equivalent to obtaining an interest-free working capital quota of 30-90 days.
Calculated at the 13% VAT rate, equipment with a cargo value of 10 million yuan can save nearly 100,000 yuan in capital occupation costs. Exported equipment can apply for the origin accumulation rule under RCEP.
As long as the proportion of raw material value of the equipment meets the requirements, you can enjoy the preferential tariff rate of 0-3% in ASEAN countries, which can reduce the tariff cost by 5-10 percentage points compared with the most-favored-nation tariff rate. Related party transaction pricing must comply with the arm's length principle to avoid anti-tax avoidance investigations initiated by tax authorities, which will generate additional tax costs.
DavidYears of service:3Customer Rating:5.0
Business Development AdvisorStart a Chat
In 2026, the CIPS system has covered more than 180 countries and regions around the world. For the receipt and payment of import and export equipment, the CIPS RMB cross-border settlement channel can be preferred.
Compared with the SWIFT channel, it can reduce the exchange cost by 2-3 basis points, shorten the settlement arrival time from 3-5 days to less than 4 hours, and avoid the exchange rate fluctuation risk of US dollar settlement. When settling foreign exchange, you can choose the forward foreign exchange settlement and rate locking service to lock the settlement exchange rate for 3-6 months in advance to avoid exchange losses caused by exchange rate fluctuations.
In 2026, the two-way fluctuation range of the RMB against the US dollar will increase, and the exchange rate locking operation can help enterprises avoid exchange losses of up to 5%. The receipt and payment vouchers should retain trade contracts, customs declaration forms, invoices and other materials in advance to ensure consistency of documents, so as to avoid early warning from the foreign exchange administration department.
RobertYears of service:6Customer Rating:5.0
Warehouse Management AdvisorStart a Chat
For the trade contract of import and export equipment, the property right transfer node, division of liability for breach of contract, and force majeure fallback clauses should be clearly defined in advance. For orders settled by letter of credit, the soft clauses of the letter of credit should be reviewed in advance to avoid unreasonable clauses such as "payment can be made only after the buyer issues a qualified acceptance certificate", which leads to the risk of foreign exchange receipt.
For imported second-hand equipment, the newness degree, production years, and whether it meets China's import access standards should be clearly specified in the contract in advance to avoid losses caused by customs return after arriving at the port. For exported equipment, the division of customs clearance responsibilities in the destination country should be clearly specified in the contract in advance to avoid goods being returned due to the buyer's failure to complete customs clearance, resulting in high return costs. You can apply for a bank guarantee as performance guarantee to reduce the transaction risk of both parties.
EmilyYears of service:3Customer Rating:5.0
Client Success AdvisorStart a Chat
For the customs inspection link of import and export equipment, the technical parameter specification, operation manual, and declaration element comparison table of the equipment should be prepared in advance. Before X-ray inspection, inform the customs of the internal structure of the equipment, whether there are radioactive, flammable and explosive components in advance, so as to avoid misjudgment as prohibited goods by the inspection equipment. When unpacking for inspection, accompany the whole process on site, and check whether the seal number is consistent with the mark on the bill of lading to avoid the problems of swapping and cargo damage.
For equipment that needs to be sent for testing, prepare the materials required for testing in advance. After sending for testing, you can follow up the testing progress, and you can get the testing report in as fast as 7 working days, so as to avoid port detention fees caused by long-term detention of goods. If there is a slight deviation between the declared content and the actual goods during inspection, you can submit a situation explanation on the spot to apply for modification, without deleting the declaration form and re-declaring.
OliviaYears of service:5Customer Rating:5.0
Senior Customs AdvisorStart a Chat
The tax refund declaration for exported equipment should ensure the consistency of four flows, that is, the goods name, quantity, and amount of the trade contract, customs declaration form, invoice, and foreign exchange payment voucher are completely consistent, so as to avoid the risk of tax refund being rejected or even being filed for verification by the tax authority due to inconsistency of the four flows. In 2026, the full process of paperless declaration for export tax refund has been realized.
Enterprises that have completed document pre-review in advance can enjoy the tax refund priority for Class A enterprises, and the tax refund can be completed and credited to the account in as fast as 3 working days, which is significantly shorter than the 15-30 days arrival time for ordinary enterprises. Tax refund documents should be retained for at least 10 years, including procurement contracts, transportation vouchers, loading and unloading notes, acceptance notes and other filing materials. When receiving tax correspondence investigation, you can submit complete materials at the first time, and the reply to the correspondence investigation can be completed in as fast as 5 working days, which will not affect the subsequent tax refund declaration.