Full Agency for Petrochemical Import Equipment, Save 30% of Customs Clearance Time, Avoid Demurrage and Exchange Rate Loss Risks
Importing from China?
Need help with sourcing, customs or shipping?
Your China Import Partner
Reliable sourcing and import agency services.
Petrochemical import equipment belongs to highly regulated mechanical and electrical goods,involving multiple sub-categories such as refining,storage,and testing,with stricter regulatory requirements than general mechanical and electrical goods.In 2026,the customs inspection rate for pressure vessels,explosion-proof equipment,and used refining equipment dedicated to the petrochemical sector will rise to 32%,18 percentage points higher than that of general mechanical and electrical goods.Once the declaration is non-compliant,at worst the goods will be detained for rectification,and at worst heavy fines will be imposed,affecting the enterprise’s import and export credit.
Differences in Regulatory Requirements for New and Used Petrochemical Import Equipment

Many enterprises cannot distinguish the regulatory rules for new and used petrochemical import equipment,leading to problems such as missing documents and failure to complete Pre-Shipment Inspection (PSI).The core regulatory differences between new and used equipment can be referred to the following table:
| Regulatory Dimensions | New Petrochemical Import Equipment | Used Petrochemical Import Equipment |
|---|---|---|
| Regulatory Document Requirements | Those included in the Catalogue of Import Licensed Mechanical and Electrical Products need to apply for an Import License for Mechanical and Electrical Products; pressure vessel types must provide Special Equipment Manufacturing License | In addition to the Import License for Mechanical and Electrical Products and Special Equipment Manufacturing License,an Import Filing Certificate for Used Mechanical and Electrical Products is also required |
| PSI Requirements | PSI is not required; only legally inspected goods need to undergo entry commodity inspection | Must complete Pre-Shipment Inspection (PSI) by CCIC; in special cases,on-arrival PSI can be applied for |
| Valuation Verification Criteria | Verify original manufacturer’s invoice,purchase contract,international freight voucher,and refer to the average import price of the same model equipment in the same period | In addition to basic transaction vouchers,also verify the equipment depreciation certificate,original value certificate,and residual value appraisal report |
| Port Inspection Focuses | Verify equipment technical parameters,explosion-proof labels,and 3C certification (for goods included in the 3C Catalogue) | Verify actual production year,wear degree,whether safety protection devices meet standards,and whether waste accessories are smuggled |
Core Practical Tips to Avoid Pitfalls in 2026
Combining nearly 1,000 cases of petrochemical import equipment operations we have handled,we have sorted out three directly implementable tips to avoid pitfalls:
- Complete advance HS code and declaration element pre-examination: classify according to the sub-items of petrochemical special equipment in the 2026 version of the Customs Import and Export Tariff,and conduct consistency verification of the brand,model,technical parameters,and original value voucher in the declaration elements 3 days in advance to avoid triggering valuation or goods detention due to non-compliant declaration.For example,a high-temperature fluid pump dedicated to petrochemicals,if incorrectly classified into the general civil pump category,will not only generate a 6% tax rate difference,but also be included in the high-risk declaration list,and all subsequent 3 imports will be subject to controlled inspection.
- Conduct advance overseas PSI pre-inspection for used equipment: since 2026,the rectification cost of non-conforming used petrochemical equipment from the EU,Japan,and South Korea to China has increased by 47% compared to 2023.It is recommended to arrange a PSI specialist to conduct on-site pre-inspection in advance,rectify non-conforming safety labels and protection devices before formally applying for PSI,which can increase the PSI pass rate from the industry average of 62% to 98%.
- Verify rules of origin and anti-dumping duties in advance: in 2026,China will still impose anti-dumping duties on some petrochemical reactors and centrifugal separators originating from the United States and the EU,with tax rates ranging from 12.7% to 68.2%.It is necessary to verify the certificate of origin in advance.For equipment meeting the origin standards of RCEP member countries,the certificate of origin can be applied for in advance to enjoy tariff reduction and exemption,with a maximum saving of 15% of import tariffs.
Reference of Real Practical Cases
At the end of 2025,Mr.Chen from Jiaxing,Zhejiang needed to import 3 used centrifugal separators for refining from Germany.The initial general freight forwarder classified the equipment into the general civil separator category and failed to complete advance overseas PSI.After the goods arrived at Yangshan Port Shanghai,they were subject to controlled inspection,requiring supplementary PSI and a 42% anti-dumping duty replenishment.The demurrage per day was EUR 1,200.Based on the customs clearance prediction at that time,the demurrage alone would incur additional expenses of more than RMB 300,000.

After receiving Mr.Chen’s request,we first re-verified the equipment technical parameters and use scenarios,confirming that the equipment belongs to petrochemical special separation equipment and is not in the anti-dumping duty collection catalogue.We then submitted the classification description and relevant technical materials,completing the classification correction within 3 days and revoking the anti-dumping duty replenishment requirement.Meanwhile,we coordinated with the overseas PSI institution to open a special on-arrival PSI channel,arranged specialists to accompany the inspection throughout the process,and completed the PSI and obtained the qualified certificate within 2 days.Finally,we submitted the equipment original manufacturer’s purchase contract,payment voucher,and depreciation certificate,smoothly passed the customs valuation,completed the entire customs clearance process in a total of 7 days,which was 22 days less than the enterprise’s predicted time,and saved nearly RMB 320,000 in total costs.
Our headquarters is located in Shanghai.We have on-site declaration teams at 8 core petrochemical import ports including Ningbo,Qingdao,Guangzhou,and Tianjin.We have cooperative door-to-door pickup and PSI service providers in 32 countries worldwide.Whether under EXW or FOB terms,we can provide full-process door-to-door agency services,eliminating the need for enterprises to connect with multiple service providers,realizing cross-port declaration at all national ports,and no additional port filing procedures required for enterprises.
Risk Warning and Agency Value
The business chain of petrochemical import equipment is long,and three core risks may easily occur.Enterprises should take precautions in advance:
The first is exchange rate loss risk.In 2026,the RMB exchange rate has increased in two-way fluctuation.Many enterprises adopt cash-on-delivery terms,with an interval of 1-2 months from booking to foreign exchange payment.The exchange rate loss may exceed 3%,and an equipment with a value of RMB 10 million may incur an exchange rate loss of RMB 300,000.We can provide supporting foreign exchange locking services,locking the payment exchange rate in advance to completely avoid exchange rate loss risk.
The second is hidden cost traps.Many freight forwarders only quote basic customs clearance fees,but do not include document exchange fees,container detention fees,and PSI rectification fees,and will increase prices at will after arrival.Our quotation is a transparent full-process quotation,with all fee items listed in advance,and no additional hidden costs will be incurred.
The third is compliance red lines.In 2026,customs has increased penalties for false or misdeclaration of classification and undervaluation of petrochemical equipment.Once identified as inaccurate declaration,not only will taxes be supplemented and fines imposed,but also the enterprise’s import and export credit level will be reduced,and the inspection rate of all subsequent import and export goods will be increased.Our risk control team will complete 3 rounds of document verification before declaration to ensure that all declaration information is completely consistent with the physical goods and meets all regulatory requirements.
If there are relevant needs for petrochemical import equipment,you can contact our team in advance.We will provide customized operation plans based on the new/used status of the equipment,country of origin,and transportation terms,and investigate all potential risks in advance to ensure the smooth customs clearance of the goods.
Recent Comments (0) 0
Leave a Reply